eftaxiaskostas@gmail.com +44 744 5035 645 LinkedIn Manchester, United Kingdom

Kostas Eftaxias

Senior Wastewater Modeller

1D / 2D network modelling, model verification and optioneering for wastewater and urban drainage networks.

Modelling Lead of the following projects:

250

Davyhulme flow monitorsUnited UtilitiesFlow Survey Management & Model Verification

206

Plymouth flow monitorsSouthwest WaterFlow Survey Management & Model Verification

18

Thames Water projectsDevelopment Services · Modelling Lead

01 / Project portfolio

From survey to solution.

Project & programme experience

ArupCURRENT

Senior Wastewater Modeller (Contract)

April 2026 – Present

Manchester, United Kingdom

Current projects

DCWW Welsh Water SOWQAS

Severn Trent Secondment

Treborth WWTW Final Design Modelling

Arcadis

Principal Wastewater Modeller (Contract)

May 2025 – April 2026

Manchester, United Kingdom

Southwest Water Storm Overflows Program

Plymouth Flow Survey
206flow monitors
  • Modelling Lead of Plymouth Flow Survey Scoping and Management, Model Build and Verification (206 monitors).
  • Automation of Interim Data Assessment using Python.
Heathfield STW
  • Modelling of Primary Treatment Works Stream.
Exmouth
  • Model Build, Verification and Optioneering.
Dittisham
  • Optioneering.

Thames Water

Development Services Support
18modelling projects
  • Modelling Lead for 18 Modelling Projects including: Model Build and Verification, Model Calibration, Flow Survey Scoping and Control, Model Updates, Detriment Analysis, Optioneering.

Stantec

Senior Wastewater Network Modeller

June 2024 – May 2025

Warrington, United Kingdom

United Utilities

Davyhulme Strategic Study
250flow monitors
  • Modelling Lead of 250 monitors flow survey.
  • Model Build and Verification.
  • 5 weeks of site visits to assist installation.
AMP8 CSOs and Better Rivers Program
  • Tintwistle & Middleton (Davyhulme): Asset Surveys, Model Updates and Model Calibration.

Arup

Urban Drainage Modeller

April 2022 – June 2024

Manchester, United Kingdom

DCWW (Welsh Water) AMP7 Framework

Denbigh TEN Scheme
  • Modelling Lead of Model Build, Verification and Optioneering.
Bangor Beach Road Shellfish
  • Detriment Analysis, Optioneering and Design Modelling.
Treborth WTW Optioneering
  • Optioneering, Nature Based Solution Modelling (Reedbed).
Chester Catchment
  • Model Verification and Strategic Optioneering.
FHO studies
  • Jacksons Bay and Bretton.

Stantec

Wastewater Network Modeller

July 2016 – April 2022

Warrington, United Kingdom

United Utilities

AMP7 Water Quality Conversions
  • Model conversions and WQ model updates.
  • WQ Model Calibration against measured data.
SOAF / Bathing Waters
  • EDM vs Model Spills comparison and Spills assessment.
  • Surface Water Separation Assessment.
  • CSO Performance Assessment.

Scottish Water

Flood Risk Heat Maps Phase 2
  • Flood Risk Assessment, based on the water level in a sewer relative to a property and/or cellar level and on the water depth on the ground at properties.
  • Joint probability assessment for ICS catchments, for combination of Urban and River worst case return periods.
  • Automation of assessment and heatmap production using FME.

Southern Water

AMP6 DAP and PR19
  • Wateringbury and Sittingbourne Catchments: Model Build and Verification.
  • Needs assessment, Solution Providing, Optioneering.
  • Model updates, Future design horizon updates.
  • Flow survey scoping, on-site visits during installation.

United Utilities

2020 Model Updates
  • Historical rainfall manipulation.

C.S. Consultants

Civil Engineer | Urban Drainage Modeller

October 2015 – July 2016

Athens, Greece

Stormwater & river modelling

Kareas – Ilioupoli storm network final design (2015–2016)
  • Detail design of storm water network.
  • Catchment hydrological calculations (Giandotti and Kiprich methods).
  • Hydrological / Hydraulic calculations, Model Build and Optioneering.
Stalida river flooding zone assessment (2015–2016)
  • Hydrological study, river catchment calculations.
  • River Flood Zones Analysis.
  • Model Build & Optioneering.
Agrinio’s rivers arrangement and drainage system design (2016)
  • Catchment hydrological calculations.
  • Rainfall calculations using Rainfall Hydrograph.
  • Model build, Hydraulic calculations and Optioneering.

Bardakis Ioannis & Co.

Graduate Civil Engineer

October 2014 – June 2015

Athens, Greece

Civil engineering & surveying

Traffic volume assessment for “Ionia Odos” highway
  • Managing a team of 14 people in two remote cities of Greece (Agrinio and Ioannina) that were undertaking traffic volume measurements for “Ionia Odos” (highway maintenance company).
  • Site visit for equipment installation and training the team members.
  • Collecting data from all the 14 surveyors and managing their shifts.
“Drama – Paranesti” railroad survey and mapping
  • Railroad survey and mapping.
Urban survey and mapping in Ano Voula, Athens
  • Urban survey and mapping covering an area of 3.6 km².

02 / Education

Engineering foundations.

National Technical University of Athens

MEng in Water Resources and Environmental Engineering

BSc in Civil Engineering

October 2004 – February 2014Athens, Greece

Thesis

“Modelling of coastal aquifers using FeFlow software”

Thesis grade9.5 / 10.00

Academic modules
  • Fluid mechanics
  • Applied hydraulics
  • Hydrology for engineers
  • Environmental engineering
  • Urban drainage networks
  • Free surface flow mechanics
  • Coastal engineering
  • WwTW engineering
  • Groundwater flow
  • Water resources engineering
  • Wastewater engineering
  • Hydraulic experiments

University GPA

6.71 / 10.00

National Technical University of Athens

1st General Lyceum of Zografou

High School Certificate

September 2001 – July 2004
Athens, Greece

GPA: 18.98 / 20.00

03 / Professional experience

Career.

April 2026 – Present

ArupCURRENT

Senior Wastewater Modeller (Contract)

Manchester, United Kingdom

May 2025 – April 2026

Arcadis

Principal Wastewater Modeller (Contract)

Manchester, United Kingdom

June 2024 – May 2025

Stantec

Senior Wastewater Network Modeller

Warrington, United Kingdom

April 2022 – June 2024

Arup

Urban Drainage Modeller

Manchester, United Kingdom

July 2016 – April 2022

Stantec

Wastewater Network Modeller

Warrington, United Kingdom

October 2015 – July 2016

C.S. Consultants

Civil Engineer | Urban Drainage Modeller

Athens, Greece

October 2014 – June 2015

Bardakis Ioannis & Co.

Graduate Civil Engineer

Athens, Greece

July – August 2005 and 2006

Hellenic Ministry for the Environment and Public Works

University Summer Placement as Trainee Civil Engineer

Athens, Greece

2-month placements in the Hellenic Ministry of Environment, Planning and Public Works.

04 / Skills & software specialisation

Technical expertise.

  • 1D / 2D Network Modelling
  • Model Build and Verification
  • Wastewater Treatment Works Modelling
  • Flow Survey Scoping, Management and Data Assessment
  • Flood Risk Assessment
  • Flood Risk Heat Mapping
  • Final Design Modelling
  • Model updates
  • Optioneering
  • Solution Providing
  • Nature Based Solutions Modelling
  • Automations

Engineering software

  • ICM InfoWorks v2026
  • MapInfo
  • ArcGIS
  • qGIS
  • Global Mapper
  • FME Data Analysis
  • PowerBI
  • AutoCAD
  • EPAnet
  • EPA SWMM 5.0
  • DHI Mike
  • FeFlow
  • HEC-RAS
  • HEC-HMS

Scripting · Coding

  • Python
  • Ruby
  • Visual Basic 6.0
  • Excel Macros scripting
  • Fortran

Office suites · General computer knowledge

Advanced computer knowledge in hardware, software and networks

Microsoft Office Suite (Word, Excel, Power Point, Access, Outlook, Project, Teams)

Windows, Linux OS

LLM and AI Applications in projects

05 / Memberships

Professional credentials.

Chartered membership

Chartered Civil Engineer with TEE

Technical Chamber of Greece

September 2014 – Present
Greece

Professional membership

Member of CIWEM

April 2017 – Present
United Kingdom

06 / Right to Work

Right to work in the UK.

Settlement status

Settled Status

Permanent Right to Live and Work in the UK